Welcome to Malibu High School. Get access to the most up-to-date information regarding facility improvement projects.

Site Updates
May 22, 2013
  • Fire Alarm Flow Switches installation is complete
  • Electrical connections at the kitchen completed

April 29, 2013
  • New MDF (Main Distribution Frame) trenching completed on 4/6/13
  • Proposal for Fire Alarm flow switches and electrical connections at kitchens is awaiting approval.
  • Elevator connections to the new fire alarm panel are completed
  • Fire alarm project is 98% complete

March 22, 2013
  • Punch list walk on the Stadium Field Lighting project is complete
  • Elevator connections to the new fire alarm panel in progress
  • Fire alarm project is 98% complete

February 6, 2013
  • Fencing is being installed around the field stadium lighting
  • New fire alarm system under testing
  • HVAC (heating, ventilation and air conditioning) system is under testing
  • Fire Alarm project is 96% complete

January 9, 2013
  • New Construction and Modernization Project:
    • Fire Coastal Development Permit (CDP) hearing scheduled in February

  • Fire Alarm:
    • 95% complete
    • Troubleshooting and final connections to PA and lighting systems are 100% complete
    • Final testing/commissioning is anticipated to occur the end of February

Stuart Sam
Director
Facility Improvement Projects
(310) 399-5865 x 79389
ssam@smmusd.org
Project Overview

Modernization and new construction will include replacing the existing library and administrative building, with a new library, three science labs, two computer labs and four general classrooms. 

Ten classrooms in Building E will be renovated and reconfigured to provide two additional classrooms and a new IT room, which will house the main technology infrastructure.  Ventilation in the gymnasium locker rooms and the existing fire alarm system will be upgraded. 

Outdoor improvements will include renovating the common areas, a new 150-space parking lot and the reconfiguration to Parking Lot A.  The equestrian trail will be relocated near the new Parking Lot “E” to accommodate a new student drop-off and pick-up lane. 

The Malibu High School project reflects CHPS (Collaborative for High Performance Schools) criteria through improved day lighting, integration of sustainable design principles, improved indoor air quality and natural ventilation, maximized energy efficiency, reduced water use and upgraded storm water management system. Construction is scheduled to begin in the third quarter of 2013 and is anticipated to be complete by the fourth quarter of 2015.

Technology

Fifteen (15) existing classrooms were upgraded to the district’s new technology standards.  The standard includes a projector and screen, document camera, DVD player, and a sound system with a wireless microphone.  The school has been upgraded to 1Gpbs networking and campus-wide Wifi.  The telephone systems were replaced with a district-wide IP telephone system (VoIP).  One teacher and eight student laptops were provided for sixteen science classrooms.  Wireless access points were installed throughout the campus and the phone system was replaced with a new IP telephone system. The campus network infrastructure was upgraded to one-gigabit bandwidth to support the wireless access and telephone upgrades.