SANTA MONICA-MALIBU UNIFIED SCHOOL DISTRICT

FACILITY IMPROVEMENT PROJECTS



Grant Elementary School



Windows, Doors, Flooring Paint Project
This project is to provide modernization of windows, doors, and flooring as well as the repainting of the campus.

The project Architect will provide an assessment of each site cataloging and documenting existing exterior windows based on an on-site visual survey and existing identification system in use by each building per campus.

The district will review documentation to identify areas in need of new paint. Interior surfaces to receive new paint will be all previously painted surfaces: walls, trim, cabinetry, ceilings, doors, etc. Exterior surfaces to receive new paint will include previously painted surfaces that are the “green” accent color: doors, trim, gutters, downspouts, columns, roof trim, guard and handrails, stair stringers, etc. Wall surfaces and site walls are excluded from the exterior painting, except for patching or repair where window replacement causes damage or removal and repair of the exterior wall required by new waterproofing for the new windows. Portable buildings are to only receive interior paint, floor finish replacement and exterior trim paint. The windows at the portable buildings will not be replaced as part of this project. Existing window treatments are to be removed and will be replaced as well. Carpet tile walk off mats per District Standards are to be installed at each exterior door on the interior side of the room.


Project Contacts:
Jason Dodd
Facility Technician
310-450-8338 x79374
jdodd@smmusd.org


Chris Emmett
Project Mgr., Consultant
Simpson & Simpson
310-450-8338 x79371
cemmett@smmusd.org