Welcome to Webster Elementary School. Get access to the most up-to-date information regarding facility improvement projects.

Stuart Sam
Director
Facility Improvement Projects
(310) 399-5865 x 79389
ssam@smmusd.org

Joe Walker
Parsons/CCM
(310) 399.5865 X79395
jwalker@smmusd.org
Project Overview

Modernization included replacing the fire alarm system with a fully automatic system.  Construction began in the second quarter of 2010 and was completed two months early in January 2011.

In the April 2013, additional perimeter security fencing was installed on campus.  To improve student and staff safety, the student drop off, parking, and bus drop off areas will be completely revised on Winter Canyon Road and Civic Center Way.  A new parking lot will also be built on Civic Center Way.  The project will also include new decorative fencing at the front entry.

Technology

Two existing classrooms were upgraded to the district’s new technology standards.  The standard includes a projector and screen, document camera, DVD player, and a sound system with a wireless microphone.  The school has been upgraded to 1Gpbs networking and campus-wide Wifi.  The telephone systems were replaced with a district-wide IP telephone system (VoIP).  One teacher and eight student laptops were provided.  Wireless access points were installed throughout the campus and the phone system was replaced with a new IP telephone system. The campus network infrastructure was upgraded to one-gigabit bandwidth to support the wireless access and telephone upgrades.  The technology upgrades were completed in 2010.