Point Dume
Point Dume
Point Dume
Welcome to Point Dume Marine Science School. Get access to the most up-to-date information regarding facility improvement projects.
Stuart Sam
Director
Facility Improvement Projects
(310) 399-5865 x 79389
ssam@smmusd.org
Project Overview

In 2011, the main gas supply lines and all of the heating units serving the buildings were replaced.    The project was broken up into two phases. 

The first phase was the installation of underground gas supply lines using a trenchless installation process.  Construction ran from April 2011 until July 2011. 

The second phase of the project consisted of the replacement of all of the heating units at the campus.  The new units will create a comfortable learning environment for students and staff.  Construction of the second phase completed in time for the 2011-2012 school year. 

Technology

Two existing classrooms were upgraded to the district’s new technology standards.  The standard includes a projector and screen, document camera, DVD player, and a sound system with a wireless microphone.  The school has been upgraded to 1Gpbs networking and campus-wide Wifi.  The telephone systems were replaced with a district-wide IP telephone system (VoIP).  One teacher and eight student laptops were provided.  Wireless access points were installed throughout the campus and the phone system was replaced with a new IP telephone system. The campus network infrastructure was upgraded to one-gigabit bandwidth to support the wireless access and telephone upgrades.  The technology upgrades were completed in 2010.

HOME | SITE MAP | CONTACT US
© 2013 Santa Monica - Malibu Unified School District. All Rights Reserved.