Welcome to Olympic High School. Get access to the most up-to-date information regarding facility improvement projects.

Stuart Sam
Director
Facility Improvement Projects
(310) 450-8338 x 70389
ssam@smmusd.org
Joe Walker
Senior Construction Manager
Parsons/CCM
(310) 857-9625
jwalker@smmusd.org
Project Overview

The modernization and new construction will include renovation of fifteen rooms, including seven classrooms.  The existing kitchen and adjacent rooms will be constructed into a new music classroom. 

The library will be renovated which will include state of the art equipment.  The existing computer lab will be modernized into a new science lab and classroom.  The main administrative offices will be relocated including a new security system, which will optimize access control. 

The current playground and hardscape will include new basketball and tennis courts.  Construction is scheduled to start in 2013 and be complete in late 2014 to early 2015.

In Summer 2010, outdoor improvements were completed at Olympic High School to enhance the site visually.

Technology

One existing classroom was upgraded to the district’s new technology standards.  The standard includes a projector and screen, document camera, DVD player, and a sound system with a wireless microphone.  The school has been upgraded to 1Gpbs networking and campus-wide Wifi.  The telephone systems were replaced with a district-wide IP telephone system (VoIP).  One teacher and eight student laptops were also provided.  Wireless access points were installed throughout the campus and the phone system was replaced with a new IP telephone system.  The campus network infrastructure was upgraded to one-gigabit bandwidth to support the wireless access and telephone upgrades.

HOME | SITE MAP | CONTACT US
© 2013 Santa Monica - Malibu Unified School District. All Rights Reserved.